Monday, February 13, 2012

Finishing touches

My wife and I spent all day doing all the finishing touches. To be honest, she and I were having such a good time, I forgot to take pictures or video. We really want to get out on the lake tomorrow, so we were just in a groove.


Here is what got done.

1. Capped off the Foam blocks and sealed them up
2. Painted the top of the foam blocks to match the bilge.
3. Installed a new pitot tube and pickup for the speedo 
4. Installed a new in dash depth finder
5. Installed the Sun deck
6. Detailed the entire interior
7. Re-mounted all the gear I moved to install the foam.
8. Fired off the engine after a two week slumber and she roared!

So as long as the wind is under control tomorrow, we will try to go out for a few hours and really stretch her legs.

I have to say, she is a sight to behold

No comments:

Post a Comment